What should a dehydration plant feasibility study cover? It should prove five things before money is committed: that raw material is available in the right quantity, quality and season; that the product has a market and a specification the plant can meet; that the process route and dryer work for that material, ideally shown by trials; that utilities, energy and operating costs give an acceptable cost per kilogram of product; and that the site, approvals, project scope and finance are realistic. A mass and energy balance links all five. This guide is for investors, promoters, farmer producer organisations and project engineers evaluating a fruit, vegetable, spice or other dehydration plant in India, Africa, the Middle East, South-East Asia or Latin America.

Why are dehydration plant projects being studied now?
Because post-harvest losses remain high and governments fund processing capacity to reduce them. FAO estimates that 13.2% of food produced worldwide was lost after harvest and before retail in 2021, rising to 31.2% for fruits and vegetables and 19.9% in sub-Saharan Africa (FAO Statistics Working Paper 23-39, 2023).
The UN’s 2023 SDG report put Latin America and the Caribbean at 14.5%. Dehydration is one way to turn perishable surplus into a storable product, but only if the plant runs enough days at a cost buyers will pay. In India, the CEFPPC unit scheme under PMKSY offers a grant of 35% of eligible project cost up to ₹5 crore in general areas and 50% in difficult areas or for SC/ST promoters, with a minimum eligible project cost of ₹3 crore (₹1 crore in difficult areas), according to an IndiaLaw LLP summary of the January 2025 guidelines (Legal 500, 5 February 2025). Applications need a detailed project report (DPR) and equipment quotations, so the feasibility study is also the base of the funding file. A grant is never certain and should not be assumed in the base case.
Which sections should the feasibility study contain?
Raw material, market and product, process and technology, mass and energy balance, utilities and site, project scope and capital cost, operating cost, finance and risks. Each section should name its data source and say whether a figure is measured, quoted or assumed, so that lenders and reviewers can check it.
| Section | Key questions | Best data source |
|---|---|---|
| Raw material | Tonnes per day, season length, solids content, price range, supply contracts | Farmer groups, mandi or market records, sampling over a season |
| Market and product | Buyers, product form, moisture and quality specification, price range | Buyer specifications, export statistics, letters of intent |
| Process and technology | Preparation steps, pre-treatment, dryer type, cooling, milling, packing | Material trials, supplier proposals |
| Mass and energy balance | Yield, water removed, heat per kg of product | Calculation from trial data |
| Utilities and site | Fuel, steam, power, water, effluent, building and land | Site survey, utility providers |
| Scope and capital cost | EPC, EP or supply-only; what is included | Quotations against one written scope |
| Operating cost | Raw material, energy, labour, packing, maintenance | Balance plus local prices |
| Finance and risk | Working capital for seasonal stock, sensitivity, break-even | Financial model |
How does the mass and energy balance drive the business case?
It converts raw material into product and fuel. Solids content and preparation losses set how many kilograms of fresh produce make one kilogram of product. Water removed per kilogram of product, multiplied by the dryer’s heat use per kilogram of water, sets fuel use. Small changes in solids or final moisture move both costs.
Worked example: one tonne of fresh vegetables
Illustrative calculation from stated assumptions, not data from any plant. A vegetable has 10% total solids. Trimming and peeling remove 15% of the fresh weight. The product leaves at 6% moisture (wet basis). The dryer is assumed to use 3,800 kJ per kg of water evaporated, about 1.6 times the latent heat. Fuel is assumed to be biomass briquettes with a net calorific value of 15 MJ/kg, burned in a boiler or heater at 75% efficiency.
| Quantity | Calculation | Result |
|---|---|---|
| Prepared material | 1,000 kg × 0.85 | 850 kg |
| Dry solids | 850 × 0.10 | 85 kg |
| Product at 6% moisture | 85 ÷ 0.94 | about 90 kg |
| Fresh produce per kg of product | 1,000 ÷ 90.4 | about 11 kg |
| Water evaporated | 850 − 90.4 | about 760 kg |
| Dryer heat | 760 × 3,800 kJ | about 2.9 GJ per tonne of fresh produce |
| Heat per kg of product | 2.89 GJ ÷ 90.4 kg | about 32 MJ |
| Fuel per kg of product | 32 ÷ (15 × 0.75) | about 2.8 kg briquettes |
With these figures, raw material cost per kg of product is about 11 times the fresh price per kg, and fuel cost is about 2.8 times the briquette price per kg. For most fruit and vegetables, raw material is therefore the bigger cost, which is why the study must test raw material price and solids content before arguing about dryer efficiency. To compare heat sources, see the GTI guide to choosing a dryer heat source.
How should the dryer and process route be chosen at feasibility stage?
From the material and product specification, confirmed by trials. Sliced and diced vegetables, spices and fruit pieces usually suit belt, band or mesh belt dryers. Free-flowing granules and particles suit vibratory fluid bed dryers. Liquids and pastes made into powder need spray dryers. Trials confirm drying time, quality and yield before the design is fixed.
- Belt and band dryers: GTI states capacity as dried product output; see band dryers and how to specify a belt dryer for food processing.
- Vibratory fluid bed dryers: see VFBD.
- Spray dryers: see how to size a spray dryer.
- Combined lines: see hybrid multi-stage drying systems.
What capital and operating costs should the study include?
Every cost needed to produce saleable product, on one defined scope. Capital cost covers land and building, civil works, preparation, drying, cooling, milling, packing, utilities, electrical and controls, erection, commissioning and contingency. Operating cost covers raw material, fuel, power, water, labour, packing, maintenance and quality testing. Working capital for seasonal stock is often underestimated.
Cost ranges vary widely with scope and location, so this article gives none. Use written quotations against one scope document. If comparing quotes, check whether each is EPC, EP or supply-only; see EPC, EP or supply-only. For indicative dryer price ranges, see the GTI guide to industrial dryer cost in India.
Which risks should the feasibility study test?
Those that move cost per kilogram or operating days the most. Test raw material price, solids content, season length, product price, fuel price, final moisture, yield losses, project delay and grant timing. A study that shows only one base case is not a feasibility study.
- Build the balance and cost model on stated assumptions.
- Vary each key input by a realistic range, one at a time.
- Rank inputs by their effect on cost per kg and break-even.
- Check the worst plausible season: fewer days and lower solids together.
- Decide which risks need contracts, trials, storage or a second raw material.
- Plan the schedule; see dehydration plant project timeline.
Frequently asked questions
It is a structured analysis that tests whether a proposed plant can obtain raw material, make a product buyers want, run on available utilities and earn an acceptable return. It combines market data, trials, a mass and energy balance, cost estimates and risk tests.
It depends on solids content, preparation losses and final moisture. In the article’s example, a 10% solids vegetable with 15% trimming loss dried to 6% moisture needs about 11 kg of fresh produce per kilogram of product.
Show the project without the grant as the base case and the grant as a separate scenario. Grants such as India’s CEFPPC are approved on merit, subject to funds, so they should not be needed for the project to be viable.
For a new product or raw material, yes. Trials confirm drying time, product quality and yield, which feed the mass balance, dryer size and cost. Without them, those figures are assumptions and the study should say so.
About Genex Tech Industries LLP (GTI Group)
Genex Tech Industries LLP (GTI Group) designs and manufactures industrial dryers, including band dryers, vibratory fluid bed dryers and spray dryers, and supports turnkey drying projects. For food dehydration plants, see fruit and vegetable dehydration plants on foodtechprojects.com. On this site, see the drying machines overview and our company profile. The head office is at 10C Middleton Row, Kolkata 700071, India.
Sources and authorship
- FAO, “Food loss estimation: SDG 12.3.1a data and modelling approach”, Statistics Working Paper 23-39, Rome, 2023 (13.2% global food loss in 2021; 31.2% fruits and vegetables; 19.9% sub-Saharan Africa).
- United Nations, The Sustainable Development Goals Report 2023, extended report, Goal 12 (Latin America and the Caribbean 14.52%).
- IndiaLaw LLP, “A Comprehensive Guide to the CEFPPC Scheme under PMKSY”, Legal 500, 5 February 2025.
- Published band dryer, VFBD, spray dryer, heat source, hybrid systems and cost pages of Genex Tech Industries LLP (GTI Group).
The worked example is an illustrative calculation from stated assumptions. This article was prepared by the editorial team of Genex Tech Industries LLP (GTI Group) with AI editorial assistance. It has not been reviewed by a named engineer, and no individual is cited as having approved the content. It is not financial, legal or funding advice.
Next step
Preparing a feasibility study or DPR for a dehydration plant? Email mktg@gtidryers.com or use the contact page. Send your raw material and its solids content, tonnes per day and season length, product specification and moisture target, available utilities and fuel, preferred contract model and the installation location.